Oakland Conduits Installation

Location: Oakland, CA

Scope: Installation of 1100-ft of 4-8” HDPE conduits

  • Pre-design profiling for constructability
  • Professional Engineered Drawings
  • CalTrans permitting documentation
  • Horizontal directional drilling
  • Mud disposal
  • Material provision and assembly
  • Customer: Pacific Gas and Electric

    The exceptional performance by all parties made this project a success. It was PG&E’s commitment to have an operational circuit by year-end and the partnership with Accu-bore made this possible. Thank you all very much for your hard work and I look forward to working with you again in the future.

    Linda Swartz
    Senior Project Manager