Oakland Freeway and Railroad Crossing

Location: Oakland, CA

Scope: Installation of 1100-ft of 4-8” HDPE conduits

  • Pre-design profiling for constructability
  • Professional Engineered Drawings for City, State, and Union Pacific approval
  • CalTrans permitting documentation
  • Customer outreach and support due to the work hours and the proximity to an apartment complex
  • Horizontal directional drilling and mud disposal with contaminants of concern
  • Material provision and assembly of the 4-8” HDPE conduits
  • Customer: Pacific Gas and Electric

    The exceptional performance by all parties made this project a success. It was PG&E’s commitment to have an operational circuit by year-end and the partnership with Accu-bore made this possible. Thank you all very much for your hard work and I look forward to working with you again in the future.
    PG&E
    Senior Project Manager